Thanks for your fast reponse
Nov 13permalink
Hi,
Is it not possible to set DAYS_BETWEEN_CHECKS and GRACE_PERIOD_LENGTH values less than 1 day for testing purpose? I am a new user and I want to test these variables if LimeLM checks for the license availability properly or not. But if the day entry option is the only available option, then I can get my test result in the best case after 2 days, which is a long time for testing.
Thanks a lot in advance
I want to test these variables if LimeLM checks for the license availability properly or not
It does.
But if the day entry option is the only available option, then I can get my test result in the best case after 2 days, which is a long time for testing.
That’s the only option.