wyDay blog  |  Downloads  |  Buy
LimeLM
wyBuild
Support forum
wyDay blog
wyDay Home

configuring DAYS_BETWEEN_CHECKS and GRACE_PERIOD_LENGTH values less than a dayAnswered

Hi,

Is it not possible to set DAYS_BETWEEN_CHECKS and GRACE_PERIOD_LENGTH values less than 1 day for testing purpose? I am a new user and I want to test these variables if LimeLM checks for the license availability properly or not. But if the day entry option is the only available option, then I can get my test result in the best case after 2 days, which is a long time for testing.

Thanks a lot in advance

Answer

I want to test these variables if LimeLM checks for the license availability properly or not
 

It does.

But if the day entry option is the only available option, then I can get my test result in the best case after 2 days, which is a long time for testing.
 

That’s the only option.

Thanks for your fast reponse

Nov 13permalink